INDUSTRIAL BORING

INDUSTRIAL BORING

Such kind of boring is needed to the people who want to get 50,000 to 500,000 gallons of water daily.
Industrial drilling have three types of dia and it may be up to 1,000 feet deep

BORING DIA

  • 8 inches dia
  • 12 inches dia
  • 15 inches dia

If you want to have the 15 inches boring you will still need to have 8 inches boring than it will be expanded into 12 inches and finally into 15 inches.
Industrial boring cost depends on the depth and dia. There are three threshold of depth in terms of cost.

BORING DEPTH

  • 00 to 600 feet.
  • 600 to 800 feet.
  • 800 to 1,000 feet.

BORING MACHINE TYPE

  • Truck Mounted

THE COST

SHIFTING OF RIG & EQUIPMENTS RS. 20,000/=

Shifting of Drilling up equipment & personnel and setting up equipment at bore point, setting up temporary camp, setting of Rig over bore point.

BORING COST (8 INCHES DIA)

  • 00 to 600 feet.
    • Cost: Rs. 600 per feet
  • 600 to 800 feet.
    • Cost: Rs. 800 per feet (You will pay Rs. 200 per feet extra only on additional 200 feet)
  • 800 to 1,000 feet.
    • Cost: Rs. 1,000 per feet (You will pay Rs. 200 per feet extra only on additional 200 feet)

CONVERSION COST: A (8 INCHES TO 12 INCHES)

  • 00 to 600 feet.
    • Cost: Rs. 600 per feet
  • 600 to 800 feet.
    • Cost: Rs. 800 per feet (You will pay Rs. 200 per feet extra only on additional 200 feet)
  • 800 to 1,000 feet.
    • Cost: Rs. 1,000 per feet (You will pay Rs. 200 per feet extra only on additional 200 feet)

CONVERSION COST: B (12 INCHES TO 15 INCHES)

  • 00 to 600 feet.
    • Cost: Rs. 200 per feet
  • 600 to 800 feet.
    • Cost: Rs. 300 per feet (You will pay Rs. 100 per feet extra only on additional 200 feet)
  • 800 to 1,000 feet.
    • Cost: Rs. 400 per feet (You will pay Rs. 100 per feet extra only on additional 200 feet)

 

YOU MAYBE NEED

ITEMS

1.  8” DIA PVC SPECIAL BLANK \ SLOTTED PIPES

  • Cost: Rs 600/= per feet
  • Type-PVC-“D” & “E” class

2.  SILICA GRAVEL

  • Cost: Rs 150/= per feet
  • Silica Gravel as per required grading size

3.  SUBMERSIBLE PUMP (NEW)

Provision & installation of submersible pump Grundfos (Italian) make refurbish with motor 25 HP including following accessories as desired below

i.  PUMP & MOTOR

Quantity: 1
Cost: Rs. 500,000/=

ii.  GI PIPES 2” DIA WITH FLANGES ATTACHED.

Quantity: as per need

Cost: Rs. 400/= per feet

iii.  MOTOR CONTROL UNIT. 30 HP

Quantity: 1

Cost: Rs. 40,000/=

iv.  CABLE 3 CORE FLAT.

Quantity: as per need

Cost: Rs. 220/= per feet

v.  TAIL PIECE.

Quantity: 1

Cost: Rs. 5,000/=

vi.  BORE COVER PLATE.

Quantity: 1

Cost: Rs. 5,000/=

vii.  TOP BAND.

Quantity: 1

Cost: Rs. 5,000/=

viii.  CLAMP.

Quantity: 2

Cost: Rs. 5,000/=

ix.  PACKING SHEET.

Quantity: 1 packet

Cost: Rs. 3,000/=

x.  NUT BOLTS (SS).

Quantity: 200 No’s

Cost: Rs. 100/= per nut bolt

xi.  SS WIRE ROPE TO HOLD PUMP.

Quantity: as per need

Cost: Rs. 110/= per feet

xii.  INSTALLATION CHARGES.

Quantity: 1 job

Cost: Rs. 20,000/=

SERVICES

1.  STRATA SAMPLING

Geological strata sample collection at 10 feet interval or change of strata and preserving & its sieve analysis.

  • Quantity: 100
  • Cost: Rs 200/= each

2.  CASING INSTALLATION

  • Tube well casing installation / lowering into borehole. (Service Only)
  • Cost: Rs 30/= per feet

3.  YIELD TEST

Yield test by air compressor / pump at any depth to 1000 ft depth max: to check quantity / quality of water and collection of water samples

  • Quantity: 1 job
  • Cost: Rs. 60,000/=

4.  GRAVEL

Gravel (Silica sand stone) packing with fine graded well screened and fed into annulus space with continuous circulation of water into the well casing through sampling pipes

  • Cost: Rs 30/= per feet

5.  DEVELOPMENT

Development of tube well by compressor / pump till water becomes clear free of silt, sand & mud

  • Cost: Rs 50,000/=

TERM AND CONDITION

PAYMENT

  • Booking token Rs.10,000/= (In advance)
  • Shifting of rig & equipment Rs. 20,000/= (In advance)
  • 50% Boring charges in advance with service order
  • 25% after 4 days of starting of work.
  • 100 % amount of Material i.e. PVC pipes & Silica Gravels to purchase the material
  • Balance amount after completion of work
  • Given rates are excluded of withholding tax and GST.

TOTAL WORKING TIME

  • Mobilization of Drilling Rig & Crew 15 Days (Maximum)
  • Setting up time for rig 02 Days
  • Drilling time 30 Days (Maximum)
  • Development of Tube well by compressor 02 Days
  • Report for completion of work 02 Days

CLIENT RESPONSIBILITIES

  • Safety & Security of Staff and Drilling Rig with all accessories
  • Power Supply for Site Work and pumping Operation
  • Water Required for Drilling works